Archive

Archive for February, 2009

Firewall Mock-Up

February 24th, 2009

Today, my wife and I lifted the body off the chassis and set it aside. The light weight of the body was surprising. It’s not structural in any way so I suppose it shouldn’t have been too surprising.

After separating the body and chassis, I trimmed the body in the area of the firewall (using flat and round files) so it would fit nicely around the chassis. Trimming is probably optional, but I wanted it to be perfect.

Next I decided to mount the firewall in a perfectly centered position and then later I’ll trim the edges of it to perfectly match-up with the body. After that step, I’ll send it out to be powdercoated black.

I marked the area on the firewall in which I will be drilling holes for the rivets but couldn’t proceed because I didn’t have the proper sized drill bits. I considered using a size that was “close” and that would probably work, but in the end I opted to mail-order them and wait so it will be “just right”.

Mark Uncategorized

Delivery

February 23rd, 2009

We took delivery of the kit on Thursday last week (February 19). My friend Jeff came over to help unload. Stewart Transport trucks have a crane mounted in them which made unloading a breeze. The most difficult part was pushing it up the driveway (which really wasn’t that difficult).

The boys and I spent the weekend taking inventory of all the components and fasteners. Tonight, we’ll start drilling holes in the sheetmetal for the floor, firewall, and trunk floor.

Mark Uncategorized